Call us 24/7: + 1(925)399 0085

Get your paper done by an expert

No matter what kind of academic paper you need, it is simple and secure to hire an essay writer for a price you can afford at StudyAcer. Save more time for yourself.

WhatsApp + 1(925)399 0085
$ 10
free
  • bibliography
  • title page
  • revisions
per page
19 k happy customers
4.7 out of 5 satisfaction rate
27 writers active

More Accounting Help

Grading Criteria must be strickly followed!

 

 Manufacturing Overhead

Borealis Manufacturing has just completed a major change in its quality control (QC) process. Previously, products had been reviewed by QC inspectors at the end of each major process, and the company’s 10 QC inspectors were charged to the operation or job as direct labor. In an effort to improve efficiency and quality, a computerized video QC system was purchased for $250,000. The system consists of a minicomputer, fifteen video cameras, and other peripheral hardware and software. The new system uses cameras stationed by QC engineers at key points in the production process. Each time an operation changes or there is a new operation, the cameras are moved, and a new master picture is loaded into the computer by a QC engineer. The camera takes pictures of the units in process, and the computer compares them to the picture of a “good” unit. Any differences are sent to a QC engineer, who removes the bad units and discusses the flaws with the production supervisors. The new system has replaced the 10 QC inspectors with two QC engineers.

The operating costs of the new QC system, including the salaries of the QC engineers, have been included as factory overhead in calculating the company’s plant-wide manufacturing-overhead rate, which is based on direct-labor dollars. The company’s president is confused. His vice president of production has told him how efficient the new system is. Yet there is a large increase in the overhead rate. The computation of the rate before and after automation is as follows:

  Before After
Budgeted Manufacturing Overhead 1,900,000 2,100,000
Budgeted Direct Labor Cost 1,000,000 700,000
Budgeted Overhead Rate 190% 300%

“Three hundred percent,” lamented the president. “How can we compete with such a high overhead rate?”

Using the module readings and the Argosy University online library resources, research manufacturing overhead.

Review the situation. Complete the following:

  • Define “manufacturing overhead,” and:
    • Cite three examples of typical costs that would be included in manufacturing overhead.
    • Explain why companies develop predetermined overhead rates.
  • Explain why the increase in the overhead rate should not have a negative financial impact on Borealis Manufacturing.
  • Explain how Borealis Manufacturing could change its overhead application system to eliminate confusion over product costs.
  • Describe how an activity-based costing system might benefit Borealis Manufacturing.

Write a 3–4-pages paper in Word format. Apply APA standards to citation of sources. Use the following file naming convention: LastnameFirstInitial_M2_A2.doc.

 

Assignment 2 Grading Criteria
Maximum Points
Defined manufacturing overhead giving three examples of typical costs that would be included in manufacturing overhead.
16
Explained why companies develop predetermined overhead rates.
16
Explained why the increase in the overhead rate should not have a negative financial impact on Borealis Manufacturing.
16
Explained how Borealis Manufacturing could change its overhead application system to eliminate confusion over product costs.
20
Explained how an activity-based costing system might benefit Borealis Manufacturing.
16
Wrote in a clear, concise, and organized manner; demonstrated ethical scholarship in accurate representation and attribution of sources; and displayed accurate spelling, grammar, and punctuation.
16
Total:
100

Our guarantees

Study Acers provides students with tutoring and help them save time, and excel in their courses. Students LOVE us!No matter what kind of essay paper you need, it is simple and secure to hire an essay writer for a price you can afford at StudyAcers. Save more time for yourself. Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Our Homework Writing Disciplines

With a highly diverse team in almost all academic fields including: